top of page
d[X].
PCS 7 DCS Design Engineering
Customer Requirement
​​
Design engineering support for proper implementation of the project
Our Solution
Our experienced engineer teamed up with the onsite project team and provided inputs on the system architecture, BOM, and design applications for 3 months.
System Implemented:
Siemens S7-1500R redundant PLC
Siemens SIMOCODE Smart MCC
Siemens TIA Portal V18 (Step7, WinCC RT Advanced)



bottom of page