BESS RTU System Engineering and Commissioning



Client Requirement
Our Approach
The client required the configuration, programming, and commissioning of SICAM A8000 RTUs across six Battery Energy Storage System (BESS) sites in Luzon — spanning Isabela, Cagayan, Pangasinan, Pampanga, Laguna, and Tarlac — to ensure reliable control and seamless integration.
We designed and configured SICAM A8000 RTUs to connect BESS sites with the NGCP grid, programmed signal interfaces, and completed testing and commissioning with the client and operators for smooth system integration
Systems & Platforms Implemented
Siemens PLCs (latest firmware version)
Siemens HMI Panels (upgraded interface)